Tower Base Strengthening

13 February 2018

Before and after.

Casting a 200mm thickness of concrete over the top surface of the raft foundation to strengthen the tower base. This job also involved swapping out all flange connection bolts on the tower. Multi-skilled, in-house teams adapt to give the Client a true ‘one stop shop’ solution.

Back

Join our mailing list

I consent for LARS Communications to: