We have recently completed the design and installation of a lattice communications tower at the Port of London Authority.
Background
The Port of London Authority owns a complex of office buildings in Gravesend, Kent. The Port Control Centre building will be undergoing a refurbishment resulting in the existing comms tower being removed. To maintain the essential communications network, a new lattice tower on top of the adjacent office building, Alexandra House, will be installed.
Description of Works
We were required to design, construct and install a new lattice communications tower on the roof of Alexandra House. The tower stands at 19.5m in height (above roof level). Following a structural assessment of the building it was determined that a secondary steelwork frame would be required to support the tower and transfer the loads onto the columns or upstand beams. LARS undertook the design and the installation of this secondary framework.
All steelwork was manufactured in our Carnforth-based fabrication workshop, transported to the location in sections where we planned and managed all cranage works in order to install the finished tower.
We were also required to complete the installation of ladder and latchway fall arrest system, as well as complete the design and installation of a lightning protection system (suitable to achieve a reading of 10 ohms).
The Tower
As well as six microwave dishes secured to the top 5m section, the tower must also support the following:
- “Birds nest” platform at the top of the tower, allowing mounting of equipment on the outer face, making access for future maintenance easy.
- VHF/UHF folded dipoles/dipole array antennas and a number of Yagi antennas. These were to be mounted facing the river and need unobstructed views up and down the river. Fibreglass pole type antennas at the top.
- Small IT kit including wifi antennas, TV aerials/dishes, GPS heads.
In order to assist the lifting of the equipment to the ‘birds nest’, we were required to design, install and commission a davit arm with a safe working load of 100kg. We were also required to design and install two 200mm wide galvanized cable trays which are installed behind the ladder from its base to the top of the structure.
Specifications
The tower is designed in accordance with BS 8100: “Lattice towers and masts Part 1. Code of Practice for loading” and “Part 3: Code of Practice for strength assessment of members of lattice towers and masts”, designed to have a service life of 50 years (economic and fatigue assessment criteria).
All platforms were designed to support any quoted equipment loads together with a general uniformly distributed loading of 1.5 kN/m.
All steelwork supplied was in accordance with EN10025 and EN10210, grades S275 & S355, all hot dip galvanised following fabrication to EN ISO 1461 with minimum average coating of 85 microns.
Finally, the ladder had to conform to BS 4211:2005 specification for permanently fixed ladders, and the latchway fall arrest system had to conform to EN353-1:2018 Personal fall protection equipment.
This was another exciting project in which to be involved, and another one which challenged our team. However, once again they were up for the challenge, ultimately delivering the project smoothly, on time and to the satisfaction of the client.