We have recently completed a monopole tower installation and antenna rigging project at Dunkeswell Aerodrome in Devon, the highest licensed airfield in the UK. Below is an overview of the process involved in this installation.
Monopole Tower Installation
The first step was to establish and mark the drop zone using warning signs and barriers. Following this, a crane was positioned on-site according to detailed specifications outlined in the crane’s lift plan and risk assessment method statement (RAMS). The monopole components, including the tower sections, ladder and fixings were delivered by wagon and carefully offloaded into the designated assembly area.
The lower section of the monopole was positioned horizontally for assembly, allowing for the attachment of the poles, ladders and Latchway. After a final check of the fixings, the monopole was lifted onto the holding down bolts, levelled and secured. A qualified climber ascended the structure to verify the fixings, bolts and verticality before removing the crane’s sling.
Gantry and Bollard Installation
The project also included the installation of a gantry. The gantry location was marked out, concrete bases were prepared and drilled for resin fixings, and the gantry poles and cable ladder were installed. For the bollard installation, the process was similar: marking the location, preparing the concrete bases, drilling and installing resin anchors before finally positioning the bollards. The base of the monopole was then grouted to provide additional stability and durability. The scope of works also included the installation of lightning protection and earthing systems, critical for the ongoing safety and functionality of the tower.
Rigging and Antenna Installation
The antenna rigging phase required close liaison with NATS and AVC to confirm rigging requirements, before proceeding with the antenna installation in accordance with NATS’ specifications. Feeder cables were carefully routed and secured into the cabin, followed by comprehensive testing, and earth kits were installed where necessary. As a final touch, an obstruction light was mounted to comply with aviation safety standards.

Training and Certification
All climbing operatives involved in this project possessed the necessary certifications to ensure the highest standards of safety and professionalism. These included:
- Tower Climb and Rescue (to MATS Standard)
- Roof Top Worker (to MATS Standard)
- RF Awareness (to MATS Standard)
- First Aid at Height
- Working at Height Medical
The Dunkeswell Aerodrome installation presented unique challenges, but the team’s expertise and meticulous planning ensured a smooth execution of the project, from the erection of the monopole to the final antenna rigging.
We’re proud to have delivered a high-quality communications infrastructure that will enhance connectivity in the region while meeting all safety and regulatory requirements.