LARS Completes Decommissioning Project in Lincolnshire

We have successfully completed a complex decommissioning project at a Radio Station in Lincolnshire. The project involved the controlled demolition of a 135-meter high triangular guyed mast structure that had been in operation since 1991. Our team worked meticulously to ensure the operation was carried out safely, efficiently and with minimal environmental impact.

Preparation and Planning

The project began well before the day of demolition. We prioritised environmental considerations, commissioning an ecologist to thoroughly survey the site. This ensured any potential wildlife implications were identified and appropriate mitigation measures were put in place. A comprehensive services search was also conducted, guaranteeing no underground utilities would be damaged during the process. To prepare the site, undergrowth was cleared from the mast’s base and guy anchor locations, enhancing safety and accessibility, all in accordance with the ecologist’s report.

In the days leading up to the demolition, our team arrived on site, delivering essential equipment. This included Heras fencing to secure the compound post-demolition, pallets, sandbags, a mobile welfare unit and multiple fire extinguishers. The gantry was removed, leaving the aircraft lighting cable intact, and chain link fencing was dismantled in the planned direction of the mast’s fall.

Demolition Day

On the day of demolition, we assembled all necessary equipment for the clean-up operation, including a 13-tonne excavator with demolition shears and grab attachment, a tracked dumper, a scrap skip and a Hiab lorry for removing scrap material.

Our explosives specialist from PDC prepared charges on the southeast guy lane anchors, utilising pallets and sandbags as protective measures. A safety cordon was established with eight marshals positioned at a 250-meter radius, all equipped with radios for clear communication.

The area was thoroughly inspected both on foot and using drone technology to ensure no wildlife or personnel remained within the cordoned zone. After confirming the area was clear, the countdown began. Following the warning siren, the charges were detonated, causing the mast to collapse in the predetermined northwest direction.

After the all-clear signal, our team inspected the fallen structure and surrounding areas to assess the situation and plan the clean-up operation.

The Clean-up

The clean-up process began immediately after demolition. Our team used demolition shears to cut up the structure. Any parts posing immediate safety risks were addressed first, and debris that had crossed access routes or drainage ditches was retrieved and repositioned within the site boundary.

By the end of the demolition day, the compound was secured with temporary Heras fencing. In the following days, scrap materials were transported via dumper for loading onto lorries, ensuring a thorough site clearance. The compound fence was reinstated, all residual scrap was removed, and a final sweep was conducted to confirm that no remnants of the mast remained. Once all plant, welfare units and equipment were removed, the site was securely locked up.

This successful decommissioning project demonstrates our expertise in handling complex structural demolition with precision and care. Our team’s commitment to safety, environmental responsibility and efficient project management ensured that this challenging task was completed to the highest standards while minimising disruption to the surrounding area.