LARS recently completed a groundworks and tower strengthening project in Faberstown, Wiltshire for MFD Communications Infrastructure on behalf of the Wireless Infrastructure Group.
Overview
LARS was responsible for extensive groundworks to prepare the site for the tower strengthening, followed by the tower remedial works, designed to ensure the long-term stability and reliability of the structure.
Phase 1: Groundworks
The initial stage focused on preparing the site for tower strengthening through detailed groundwork operations. Our team began by preparing the ground for the subsequent tower strengthening works, including breaking out and reinstating the concrete plinth, laying of concrete, earth tape installation and site clearance.
Phase 2: Tower Strengthening
Following the groundworks phase, LARS undertook structural strengthening measures, including remedial bracket work at 10 metres under the platform. This involved accessing the tower and platform and removing grillage, carrying out the strengthening works and replacing the steel member.
Location:
Faberstown, Wiltshire
Sector:
Communications
Service:
Tower Strengthening and Structural Upgrades
Groundworks and Tower Strengthening
- GROUNDWORKS
- Hand breaker to be used to remove the raised existing concrete plinths around each tower leg and concrete to be chiselled away from the tower members.
- Loosen fixings and replace each tower member.
- Concrete shutters to be set up around the tower leg/members.
- A concrete mix will be used to construct the base plinth – poured into shutters, levelled and finish applied to customer’s specification.
- Once the concrete is cured, the shutters are removed.
- Surface mounted tapes will be run to each tower leg, reinstating the existing earth tape if possible or install new.
- All broken concrete and redundant members to be removed from the site.
- TOWER STRENGTHENING
- Install scaffolding internally to the steel frame.
- Establish and mark drop zone.
- Set up a rope system to take the weight of steel member to be swapped.
- Unbolt fixings from each end of the steel member – bolts may need to be cut with a grinder if required to remove them.
- The steel can now be lowered to the ground utilising a capstan winch – existing steel used as a template to mark the new steel to match existing.
- New steel drilled and cut to length, cleaned and painted around holes with galvafroid paint.
- Existing brackets on the tower will be cleaned and any excess rust removed and galvafroid paint applied before the new steel is to be lifted into place.
- New steel lifted up using the capstan winch and bolted to the existing brackets.
- Tighten all bolts.
- Repeat process for each member.
- Site left clean and tidy.
OUTCOME
The successful completion of this tower strengthening project in Wiltshire underscores our expertise in tower strengthening and groundworks, supporting critical communication networks across the UK. The upgraded tower now stands ready to continue its vital role in supporting wireless communications infrastructure in the Wiltshire region.
For more information on our projects and services, please click here.